Monday, July 27, 2009

Parking around 17th & Sanchez

The 'jack and bore' activities, tunneling under the intersection at 17th and Sanchez, will require open pits on both sides of 17th. Also, traffic regulations, require that the contractor restrict parking 24 hours --3 to 4 spaces on each side of 17th to provide the legally required lane width for traffic. SFPUC is attempting to confirm alternate parking with the school district.

There is no other place for the heavy equipment to be stored. This equipment is too wide for the spaces we have investigated for contractor overflow. Please bear with us as this final work south of Market is accomplished.

Friday, July 24, 2009

Potholing on Sanchez from Market to Duboce

Crew will start potholing on Sanchez from Market Street to Duboce for one week. This is to identify utilities locations for laying out of the new water main alignment. Work hours 8:00 am -5:00 pm. Approximately 25 feet of parking on north and south sides of Duboce will be impacted. Construction noise can be expected.

The crews have been instructed to make every effort to minimize noise and disruption. We apologize for the inconvenience.

Tuesday, July 21, 2009

Water Service to be fully Restored by 5:15 pm

Water service connections are nearly complete and water will be restored within half hour.
Call 279-3070 if you have special needs or concerns. Back-up number 554-3297.

Friday, July 17, 2009

Water Service Interruption

Tuesday, July 21
Noon – 4 pm
Location: 17th St. from Noe to Sanchez
18th St. from Sanchez to Church
Ford St. from Noe to Sanchez
Dorland St. from Sanchez to Church
Church St. from 18 to 17th
Noe St. from 17th to Ford

On Call: 415/ 279-3070
Para español: 415/554-3286
(please don’t call 694-3161. Mr. Martin has moved on to other projects)

SFPUC water operations will be connecting the new water main to our city distribution system on Tuesday, July 21 on Sanchez Street between 17th and 18th.

This will require the crew to interrupt your water service temporarily during the hours listed above. We apologize in advance for this inconvenience.

The crews have been instructed to make every effort to minimize noise and disruption.

If you have specific health or water needs, please contact us immediately 415/ 554-3244. We will coordinate between our water operations crews and our Public Health department representative.

Thank you for your patience and support as we work to improve your drinking water delivery system.

SFPUC Construction to begin soon on Crestline Drive

Beginning as early as the last week of July 2009, Cal State Constructors, the contractor working for the San Francisco Public Utilities Commission will begin work on the new water pumping station (Vista Francisco) located on Crestline Drive (approximately mid-block).

The purpose of this project is to improve water delivery to the neighborhood and system reliability.


The Vista Francisco Pump Station is one of approximately 70 Water System Improvement Program projects that will repair, replace and seismically upgrade the Hetch Hetchy Water System.

Vista Francisco Pump Station

Friday, July 10, 2009

Thank you for coming to the Neighborhood Coffee


Thank you for coming to the first Noe Neighborhood Coffee Meeting. We had nearly 20 neighbors come by and share their concerns, provide valuable suggestions, ask questions about this important water system improvement project and enjoy a cup of free coffee on us.

Please join us at one of our upcoming Coffee Meetings scheduled for: 7/24, 8/14 and 8/28 at H Café (3801 17th Street@ Sanchez). Hope to see you there.

Digging on Sanchez and 17th



Crew will begin digging large pits on both sides of the intersections and installing the pipeline under the street between the two pits next week through August. Parking will be restricted 200 feet from the pits. At least one lane of traffic will remain open and sidewalk use will be limited to the opposite sides of the intersections.

19th between Noe & Sanchez and Sanchez between 18 and 19th

Crews continue to work on making service connections to businesses and residents through August. Final paving is schedule for early September.

Sanchez@16th

We apologize for the inconvenience and disruption the night work has caused you.