Friday, September 25, 2009

Final Street Paving on Sanchez between 18th and 16th


Final street paving will take place Monday, September 28 through Wednesday, September 30

What: Final street paving will begin on Sanchez from 18th to 16th Street.
Expected duration: 3 days
Work hours: 8am – 6pm.

Traffic: Traffic will be rerouted during construction, but one lane of traffic will remain open. Please allow additional time for travel.

Parking: We are making every effort to minimize parking impact. If construction doesn’t begin by noon, parking is available.

We appreciate your patience during construction. Please join us for one last cup of coffee and other treats at the H Cafe (3801 17th @Sanchez) on October 1, Thursday. We will be there at 8:00 am and look forward to thanking you in person.

If you have any questions please contact Jim Chien of SFPUC Communications at 415-554-3244 or visit sfwater.org/district8 for weekly updates.

Join us at the Big Blue Bucket Eco Fair on Saturday, Sept 26th!

The SFPUC is GREEN with excitement to announce the 2nd annual




Saturday, September 26th, 2009
10 A.M to 2 P.M.

Jerrold Avenue @ Phelps Street in San Francisco

Learn how to go green, and turn your beautiful home blue!
Visit bigbluebucket.org for more information!

Friday, September 18, 2009

Final Street Paving on Noe and 19th Street

Final street paving will take place
Monday, September 21 through
Thursday, September 24



What: Final street paving will begin on Noe Street from 22nd to 20th and on 19th Street from Noe to Sanchez.
Expected duration: 4 days
Work hours: Monday thru Friday, 8am – 5pm.

Traffic: Traffic will be rerouted during construction, but one lane of traffic will remain open. Please allow additional time for travel.

Parking: We are making every effort to minimize parking impact. If construction doesn’t begin by noon, parking is available.

We apologize for the inconvenience and are doing everything we can to minimize the impact to our neighbors.

If you have any questions please contact Jim Chien of SFPUC Communications at 415-554-3244. Visit sfwater.org/district8 for weekly updates.

Friday, September 11, 2009

Construction Update - Duboce Triangle and Lower Haight


Steiner from Duboce to Haight
Crew will begin installing 24-inch transmission main on Steiner from Duboce to Waller as soon as next week and then continue on Steiner from Waller to Haight. This phase of the work is expected to complete in 3 weeks. During construction, one lane of traffic will remain open for both cars and bikes. We have worked with the Department of Parking and Traffic on alternative routes and encourage bikers to use alternatives to avoid accidents.

Sanchez from Market to Duboce
City water operations crew will start working on pressure testing and making service connections to home and businesses. Traffic will be detoured. Please allow additional time for traffic. This phase of work is expected to be completed in 3 weeks.

Work Hours: 8:00 am - 5:00 pm
Parking: We will make every efforts to minimize parking impact. If you don’t see construction by noon, you are allowed to park. Duration:The project is anticipated to complete before Thanksgiving holiday.

Thanks you for patience and cooperation.
Please join us for the next Neighborhood Coffee at Bean There Coffee and Tea shop at 201 Steiner (@ Waller) from 8:00 to 9:00 am, Wednesday, 9/16, and enjoy a cup of coffee or tea on us.
.

Multiple Projects At Henry & Sanchez Streets

A neighbor brought to our attention that there are debris and other construction materials remaining at Henry and Sanchez. Our inspector verified that this is actually PG&E’s locker and project work (see photos below). We do have a contact in PG&E Public Affairs and will send the comment on to him for action.

Nonetheless, our Project Manager has instructed the crew to double back to make sure the SFPUC project has not left behind debris or any “No Parking” signs or extraneous materials.

Thanks for bringing this to everyone’s attention.


PG&E No Parking Sign Located on Henry & Sancez

PG&E Staging Area on Henry and Sanchez

Street restoration work on Noe between 19th and 20th is nearing completion

Parking should be available on Noe Street between 19th and 20th streets as early as this weekend. We need a couple more weeks to complete work on Sanchez, and hope to reopen all parking and traffic lanes on both streets by the end of this month. Parking impacts will be kept to a minimum throughout this work. Thanks for your patience as we work to repair our water system.

Thursday, September 3, 2009

Street Restoration - Sanchez between 18th & 19th


Street restoration work underway, to
continue through Friday, September 25 for the entire block


 What: Demolition on Sanchez Street from 18th to Hancock has begun. Hancock to 19th is scheduled to begin Tuesday, September 8. This work includes sawcutting, removing of old concrete and pouring of new concrete.

 Garage: To cure the concrete surface and maintain a safe driveway, access to your garage will be restricted up to 5 days.

 Traffic: Contractor will proceed uphill from 18th Street working in sections. Traffic will be rerouted during construction. Please allow additional time.

 Parking: Contractors are working only one side of the street at a time to minimize parking impact.


We apologize for the inconvenience and are doing everything we can to minimize the impact to our neighbors. Your cooperation in moving your vehicles from your garage will help us finish our work as quickly as possible.

If you have special needs or an emergency situation, the inspector on site will work with you. You may also call Jim Chien of SFPUC Communications at 415-554-3244.